The concentration of waste on dumping sites and the construction of infrastructures often involve alterations to the physical environment in which they are located.
The financial cost and time involved in the environmental correction, integration and regeneration work often makes it incompatible with using the land or with the building work. GINESTA restored the damage caused in these area by applying the latest techniques to achieve two things: create a pleasant landscape and create a recreational area.
We recover spaces near roads, quarries, mountain shelters, old dumping sites etc., and integrate them with the environment.
